8 Maintenance Procedures for Industrial Chillers
2024-12-31
Eight maintenance procedures for industrial chillers are provided, including inspection, cleaning, alarm handling, regular inspections, etc., which are helpful for chiller maintenance.
Industrial Chiller Maintenance:
- The various protection device settings of the industrial chiller unit have been set and should not be changed arbitrarily.
- Regularly check whether the radiator system of the chiller unit is normal, whether the cooling tower fan and nozzles are operating normally, and whether the water replenishment of the built - in water tank of the chiller unit is normal. Regularly check whether there is any refrigerant leakage in the chiller unit: It can be judged by referring to the parameters displayed on the high - and low - pressure gauges on the front panel of the main unit.
- When the unit issues a fault alarm, first press the alarm button, then check the cause of the fault. Remember not to force - start the unit before troubleshooting.
- During use, if there is no emergency, do not cut off the power and turn off the unit arbitrarily. In winter, if the unit is out of use for a long time, first turn off the unit, and then turn off the main power supply to drain the water in the cooler completely.
- When using an industrial chiller, keep the machine room clean and well - ventilated, and regularly clean the condenser to ensure the normal operation of the unit.
- For air - cooled chiller units, after starting, check whether the fan rotation direction is correct. If the rotation direction is normal, it can be used normally. If it rotates in reverse, the power supply is reversed, and the phase sequence needs to be changed before starting again. In addition, ensure good heat dissipation effect. This requires keeping the surface of the cooling water radiator clean, ensuring air circulation around the machine, and a low temperature, and regularly cleaning the fins.
- For water - cooled coolers, keep the cooling tower clean, ensure air circulation around the water tower and a low temperature, and avoid debris from entering the cooling tower to reduce heat dissipation.
- The industrial chiller should be system - cleaned every six months and once a year. The main components to be cleaned include the cooling tower, hot water pipe, and condenser components to ensure better refrigeration. If the cooler has been in use for more than 6 months and frequently experiences dehumidifier or high - and low - pressure switch failures, or a decrease in cooling capacity, professional maintenance personnel should be invited for repair.
Related Articles
- Basic Faults and Preventive Maintenance of Water - cooled Units
- Essential for Maintenance! Parameters and Phenomena of Normal Operation of Refrigeration and Heating Systems
- Welding Equipment Used in Refrigeration System Maintenance
- Maintenance Methods for Small Modular Cold Storage Failures
- Maintenance Techniques for Air - conditioning Refrigeration Systems
- Maintenance Strategies for the Working Cycle and Electrical Automatic Control of Chillers
- Essential Basics for Maintenance, Debugging of Refrigeration and Air - conditioning Systems
- Requirements and Maintenance for Building Meat Food Cold Storage
- Maintenance Methods for Faults in Screw Refrigeration Air - conditioner Compressors
- Maintenance Methods for Refrigerant Leak in Air - conditioner Outdoor Unit
- Knowledge, Installation and Maintenance of Cold Storage Systems
- Are you familiar with the detection and maintenance methods of air conditioner components?
- Maintenance and Operation of Freezing and Cold Storage Warehouses
- Water-cooled Screw Chiller: Operation and Maintenance
- Daily Maintenance Training for Users after Installation of Small and Medium-Sized Cold Storages
- Maintenance of Screw Chiller
- Maintenance of Screw Chiller
- On the maintenance and inspection of external insulation layers of pipes in refrigeration devices