- The location of the cold storage installation unit should be as close as possible to the evaporator for easy maintenance and excellent heat dissipation. If it needs to be moved outward, a rain shelter should be installed.
Shock-proof gaskets should be placed at the four corners of the cold storage installation unit. The installation should be level and stable and not easily touched by people. - Installation of the radiator of the cold storage installation unit. The installation location of the radiator should be as close as possible to the cold storage installation unit and can be at a higher position on the side of the cold storage installation unit. The installation location of the radiator should have a better heat dissipation environment. The air inlet should not face the air outlet of other installations, especially oily gases.
The air outlet should not be short-circuited or face other windows (especially residential windows) for installation. It should be 2 meters above the ground. The installation should be level and stable. - Copper pipe layout for the cold storage installation unit. All copper pipes need to be separately inserted into insulation tubes and bundled together with wires in the same direction using air conditioning cable ties. Try to use straight pipelines and fix them in sections.
- Since the cold storage installation unit and air cooler are all pressure-sealed in the factory, when opened, there should be pressure. You can check for leaks. The factory copper pipes should have dust-proof measures at both ends. During construction, pay attention to sealing at any time to prevent water and dust from entering the pipe. The condenser, cold storage installation main unit, and air cooler are connected by copper pipes and welded. The interface is firm and beautiful.
- Configure wires according to the performance of various electrical appliances. The wire diameter meets the requirements. The joints are firm. If protection pipes are required, they cannot be omitted. The wiring is correct. When the wire enters the junction box hole of the evaporator, it needs to be sealed with silicone. If the lamp is above 36V, a grounding wire is required. The power inlet in the electric cabinet of the cold storage installation unit requires three-phase five-wire system with reliable grounding.
- The temperature display probe of the cold storage installation unit is inserted into the return air outlet of the evaporator in the cold storage and is suspended. The defrosting temperature probe of the cold storage installation unit is inserted into the return air outlet of the evaporator in the cold storage through another hole. The probe is inserted into the fin (not close to the electric heating tube).
Related Articles
- How to Calculate Refrigeration Load? And What Are the Issues?
- What Issues Should Be Noted in Cold Storage Installation and Construction?
- Can You Solve These 4 Common Issues of Industrial Chillers?
- Frosting and Defrosting Issues of Air - cooled Heat Pumps
- Common Issues in Chiller Operation and Solutions
- Common Issues in Refrigeration Systems
- Common Issues with Refrigeration Equipment: What to Do?
- Introduction to the Components of a Cold Storage Unit and Common Issues in Cold Storage Units
- Could a Tiny Copper Tube Cause a Multi - split Air Conditioner to Stop Cooling? Refrigeration Workers Must Pay Attention!
- What safety measures should be paid attention to during the installation of cold storage?
- What should we pay attention to when installing evaporative condenser?
- Analysis of Seven Reasons for Ice Formation in Computer Room Air Conditioners
- For Computer Room Air Conditioners, Besides Air - cooled and Water - cooled, What Other Cooling Methods Are There?
- Safety Regulations for Ammonia Refrigeration Machine Room
- Instructions for Welding and Drainage in the Installation of Refrigeration Equipment Pipelines
- What is the Correct Operation Method of the Distribution Box during Cold Storage Installation?
- What Special Requirements are There for the Installation of Tea Cold Storage?
- Operating Principle and Standard Installation Steps of Multi - split Systems in Refrigerant Air - conditioning Systems