The maintenance period of the screw compressor unit is related to many factors. The following information is for reference.
(1) The motor of the screw compressor: Disassembly, maintenance, and replacement of parts, lubrication of bearings. The period is 2 years.
(2) Coupling: Check the coaxiality of the compressor and the motor (check whether the elastic drive plates are damaged or the rubber pins are worn). The period is 3 - 6 months.
(3) Oil separator: Clean the interior. The period is 2 years.
(4) Oil cooler: Remove scale (for water - cooled) and oil dirt. The period is half a year, depending on the water quality and dirt conditions.
(5) Oil pump: Check for leaks and conduct maintenance. The period is 1 year.
(6) Oil filters (including the coarse oil filter) and suction filters: Clean. The period is half a year. They should be cleaned 100 - 150 hours after the first start - up.
(7) Oil pressure regulating valve: Check the regulating capacity. The period is 1 year.
(8) Slide valve: Check the operation. The period is 3 - 6 months.
(9) Safety valves, pressure gauges, and thermometers: Calibrate. The period is 1 year.
(10) Check valves, suction and discharge stop valves, and pressure gauge valves: Conduct maintenance. The period is 2 years.
(11) Pressure relays and temperature relays: Calibrate. The period is about half a year. Refer to the manual.
(12) Electrical equipment: Check the operation. The period is about 3 months. Refer to the manual.
(13) Automatic protection and automatic control systems: The period is about 3 months.
(1) The motor of the screw compressor: Disassembly, maintenance, and replacement of parts, lubrication of bearings. The period is 2 years.

(2) Coupling: Check the coaxiality of the compressor and the motor (check whether the elastic drive plates are damaged or the rubber pins are worn). The period is 3 - 6 months.
(3) Oil separator: Clean the interior. The period is 2 years.
(4) Oil cooler: Remove scale (for water - cooled) and oil dirt. The period is half a year, depending on the water quality and dirt conditions.
(5) Oil pump: Check for leaks and conduct maintenance. The period is 1 year.

(6) Oil filters (including the coarse oil filter) and suction filters: Clean. The period is half a year. They should be cleaned 100 - 150 hours after the first start - up.
(7) Oil pressure regulating valve: Check the regulating capacity. The period is 1 year.
(8) Slide valve: Check the operation. The period is 3 - 6 months.
(9) Safety valves, pressure gauges, and thermometers: Calibrate. The period is 1 year.
(10) Check valves, suction and discharge stop valves, and pressure gauge valves: Conduct maintenance. The period is 2 years.
(11) Pressure relays and temperature relays: Calibrate. The period is about half a year. Refer to the manual.
(12) Electrical equipment: Check the operation. The period is about 3 months. Refer to the manual.
(13) Automatic protection and automatic control systems: The period is about 3 months.
Related Articles
- What Misconceptions Should Be Avoided in Low - temperature Refrigeration System Repairs
- A Complete Guide to the Operation, Malfunctions and Repair Methods of Dry Screw Refrigeration Compressors!
- Operation: Analysis of 20 Major Faults of Screw Compressors!
- Maintenance Methods for Screw Chiller Units
- Analysis of Causes for Exhaust Malfunctions of Screw - type Chiller Compressors
- Working Principle and Characteristics of Screw Compressors
- Performance Comparison of Multi - connected Units, Air - cooled Modules and Water - cooled Screw Units
- Screw Chiller Units and Centrifugal Chillers
- Comparison Issues between Air-Cooled Screw Units and Air-Cooled Modular Units
- Screw Compressor Units: Principles, Design and Selection - Essential Guide for Refrigeration Beginners
- Oil Cooling Methods and Oil - changing Operation Procedures for Screw Compressors
- Precautions for Commissioning of Screw Parallel Units
- Composition and Common Faults of Screw Refrigeration Compressors
- Operation of Screw - type Water - cooled Chiller Units
- What Are the Reasons for Insufficient Air Output of Screw Air Compressors?
- Maintenance Methods for Faults in Screw Refrigeration Air - conditioner Compressors
- Reference Points for Selection of Screw - type Chillers
- Water-cooled Screw Chiller: Operation and Maintenance