During the installation of a small - scale cold storage, in fact, all positions need to cooperate with each other. The quality of the small - scale cold - storage project is directly related to the cooperation among positions. The installation of a small - scale cold storage is a highly technical task. During the installation process, we need to pay special attention to many details to ensure the quality of the cold - storage project accordingly.
The small - scale cold storage should be protected with corrugated hoses. Besides tying all the wires with cable ties, the temperature - display wires should preferably not be placed together with the other wires. Otherwise, it will have a certain impact on the later use. The arrangement of wires is of great importance for a small - scale cold storage. It is best to fix the copper pipes in sections. All copper pipes must be wrapped together with the wires in the same direction as the insulation pipes. The joints of the insulation pipes should also be taped together, which can make the small - scale cold storage safer during use. This can effectively reduce the occurrence of safety accidents and extend the service life of the small - scale cold storage. It is advisable to install the radiator directly above the main unit. The closer the radiator is to the main unit, the more beneficial it is for the use of the small - scale cold storage. The radiator should be placed in an environment with good heat - dissipation conditions. The air - intake port should not face the air - outlet port of other equipment, and the air - outlet port must not face the window, such as a residential window or the air - outlet port of other equipment.

What issues should be noted during the installation of a small - scale cold storage?1740414904599

At the same time, the radiator must be firmly fixed horizontally.
When installing the refrigeration system of a small - scale cold storage, the connection should be unsealed first. The condenser of the main unit is sealed at the factory, so there is always a certain pressure. Only after unsealing can we check for leaks. During the construction process, we should also conduct a careful inspection. Sealing it at any time is very important.

What issues should be noted during the installation of a small - scale cold storage?1740414904645

To prevent dust from entering the pipes of the evaporator, we need to use welding for connection. This connection method is more secure and also has a certain aesthetic appeal. However, the wires must meet the requirements. The joints must be firmly fixed without skipping any steps, and the connection points must be correct. Only in this way can the small - scale cold storage be used normally.
The above are some details that need to be noted during the installation of a small - scale cold storage. To ensure better use of the small - scale cold storage in the later stage, we must pay special attention to these details. If we can pay attention to these details during the installation process, we can also reduce the probability of malfunctions.